RLC LOAD FOR ANTI-ISLANDING TEST
A problem when using photovoltaic generation
In the event of switching off or loss of function of the supervising supply network, islanding networks can appear. Within these the local generator is still driving the supply voltage and supplying the network connected loads without any monitoring and supervision of voltage level and waveshape and frequency of the power supply companies.
In this case damages can occur on the connected equipment, on customer loads as well as accidents on the service personnel.
Our test system for anti-islanding is a RLC load for testing according to IEC/EN 62116 and VDE 0126-1-1.
This product is temporarily out of stock. You may opt-in our waiting list and we'll notify you once the product is restocked.
Datasheets